BS 7671, Requirements for Electrical Installations, is the British Standard for electrical installation work in the UK, published jointly by the IET and BSI as the IET Wiring Regulations. It is in its 18th Edition, and the current version is BS 7671:2018+A4:2026. It is not law in itself, but it is the benchmark that inspections, competent-person schemes and landlords’ electrical checks are measured against. The questions above test the parts people are most often asked about.

Set up a timed mock test

BS 7671 at a glance

Full title
Requirements for Electrical Installations. IET Wiring Regulations
Current version
BS 7671:2018+A4:2026
Amendment 4 published
15 April 2026
Previous edition
With A2 and A3: withdrawn 15 October 2026
Structure
Eight parts, then the appendices
Legal status
Non-statutory, but named in law for rented homes

Dates and structure as published by the IET and BSI, checked 23 September 2026. Until 15 October 2026 installers may work to either edition; from that date Amendment 4 must be used.

How BS 7671 is organised

A regulation’s number tells you where it lives: the first digit is its part, the next its chapter. Part 2 matters more than it looks, because many disagreements turn out to be about a defined term. The appendices carry most of the numbers, including the cable current-carrying capacity and voltage drop tables in Appendix 4 and the device characteristics in Appendix 3, so knowing which appendix holds what is the most useful navigation skill in an open-book assessment.

The eight parts of BS 7671:2018+A4:2026
PartTitleWhat you find there
1Scope, object and fundamental principlesWhat the standard covers, and the principles every installation must meet
2Terms and definitionsThe defined terms the rest of the standard relies on
3Assessment of general characteristicsThe supply, the earthing arrangement (TN-S, TN-C-S, TT or IT) and what the installation is for
4Protection for safetyProtection against electric shock, thermal effects, overcurrent and voltage disturbances
5Selection and erection of equipmentCables and wiring systems, protective devices, earthing and bonding, and batteries
6Inspection and testingInitial verification, periodic inspection, and the certificates and reports
7Special installations or locationsBathrooms, swimming pools, construction sites, EV charging, solar PV, medical locations and more
8Functional requirementsEnergy efficiency, and installations that generate or store their own energy

What Amendment 4 changed

Amendment 4 was published on 15 April 2026. It gathers every earlier amendment, including Amendment 3, into one volume and adds and rewrites material:

  • Chapter 57, a new chapter on stationary secondary batteries.
  • Section 716, a new section on Power over Ethernet, the DC power carried on data cabling.
  • New requirements for functional earthing and bonding of information and communication technology equipment.
  • A major revision of Section 710, medical locations.
  • Energy efficiency moved out of Appendix 17 and into Part 8 as Chapter 81.
  • On a condition report, FI now means further investigation is advised, and a C3 or FI on its own no longer makes the report unsatisfactory.
BS 7671:2018 and its amendments
VersionIssuedWhat it did
BS 7671:20181 July 2018The 18th Edition, in force from 1 January 2019
A1:20201 February 2020Revised Section 722, electric vehicle charging
A2:202228 March 2022A major amendment that added Part 8, for prosumer installations
A3:202431 July 2024Bidirectional and unidirectional protective devices; used alongside the A2 book
A4:202615 April 2026Every amendment in one volume, plus the changes above

Plan for the Amendment 4 changeover

Is BS 7671 the law?

Not in itself. HSE describes the Wiring Regulations as non-statutory, and the Electricity at Work Regulations 1989 never name them; following BS 7671 is, in HSE’s words, likely to achieve compliance with the relevant parts of those regulations.

Other law points at it directly. In England, the electrical safety regulations for rented homes define the standard an installation must meet as the 18th Edition, BS 7671:2018, and require an inspection at least every five years; they now cover social housing as well as private lets. Wales names BS 7671:2018+A2:2022 in its equivalent rules.

Part P of the Building Regulations requires reasonable provision for electrical safety in dwellings. BS 7671 is how that is met in practice, although Approved Document P still cites the 2008 edition.

What BS 7671 requires that people get wrong

Earthing and bonding arrangements follow from the supply type, not from habit. A PME supply needs main bonding sized against the supply neutral conductor; a TT installation depends on its own electrode and an RCD for fault protection.

Cable selection is a coordination chain: design current, then device rating, then cable capacity after grouping, ambient temperature and thermal insulation have reduced it. Skipping a step in that chain is the classic error.

RCD type is matched to the residual current the device must detect, not to the name of the circuit. Loads with electronic components can produce residual currents a Type AC device will not see.

Certificates and reports

Appendix 6 holds the model forms. An Electrical Installation Certificate covers new installations and work that adds a circuit; a Minor Electrical Installation Works Certificate covers smaller additions and alterations that do not; an Electrical Installation Condition Report records the condition of an existing installation.

A condition report codes each observation: C1, danger present; C2, potentially dangerous; C3, improvement recommended; FI, further investigation. Under Amendment 4 the report is unsatisfactory when any C1 or C2 is recorded; C3 and FI are recommendations.

The standard is copyright of the IET and BSI, so this page explains its structure and principles without reproducing regulation text. Buy the current edition from the IET or BSI for the authoritative wording.

BS 7671, the On-Site Guide or Guidance Note 3?

BS 7671 contains the installation requirements. The On-Site Guide helps with common arrangements within its scope, and Guidance Note 3 develops inspection and testing. Match the book to the task and check its edition before using it.

Compare the books, editions and exam rules

Common questions

Is BS 7671 a legal requirement?

Not in itself: it is a British Standard, and HSE calls it non-statutory. But the rules for rented homes in England and Wales name it, Part P work is judged against it, and following it is the usual way to show compliance with the Electricity at Work Regulations.

What is the current version of BS 7671?

BS 7671:2018+A4:2026, published on 15 April 2026. The previous edition, with Amendments 2 and 3, stays valid until 15 October 2026; from that date Amendment 4 must be used.

What is the difference between BS 7671 and the 18th Edition?

They are the same document. BS 7671 is the standard’s number, and the 18th Edition is the edition first issued in 2018, since amended four times. "18th Edition" is also the common name for the qualification assessed against it.

How many parts does BS 7671 have?

Eight. Part 8, Functional requirements, arrived with Amendment 2 in 2022 for installations that generate or store energy, and Amendment 4 added energy efficiency to it as Chapter 81. The appendices follow the parts and hold the tables.

Is there a 19th Edition of the Wiring Regulations?

Not yet. The IET has not announced one, and Amendment 4 is the current version of the 18th Edition. The IET says a new revision of BS 7671 is usually published every four years.

Do I need to own a copy of BS 7671?

For a City & Guilds 2382 assessment, you need access to the permitted edition of BS 7671. Check whether your centre supplies the examination copy before buying one, and confirm the edition and permitted markings. For installation work, use the current standard.

Check the permitted exam book and markings

What is the IET On-Site Guide?

A practical companion to BS 7671 for competent installers working within its scope, up to 100 A three-phase. It supports the full standard and does not replace it. For the City & Guilds 2382-26 exam, the permitted reference book is BS 7671 itself; the On-Site Guide is not permitted.

Revision to support these questions

Keep going

Knowing where a requirement lives in BS 7671 is worth more in an open-book assessment than remembering the number. PlumbRevise covers the standard part by part, with the 2391 inspection and testing bank alongside it.